Padron 4678, Punta del Este

Area

1.466 m²

Zone

1.2.5

Locality

Punta del Este

Manzana

55

Padron 4678 — 3D Envelope Open fullscreen →

Applicable Zone

Titulo II, Cap. II, Sector 1 — Punta del Este — Zona 1.2 Centro — Subzona 1.2.5 Resto de zona centro

Source: Dto.Jta.Dep. 3718/1997, Art. D.189.

Permitted Building Types

Per Art. D.179: In the Punta del Este sector there are no minimum lot area or frontage requirements (except in Zona 1.3). All building types are permitted. However, the zone’s height and density parameters effectively constrain the building to a low block.

TypeAvailable?
ViviendaYes
Low block (12 m)Yes
HotelYes
Commercial/OfficesYes

The PH regime means this lot is already subdivided into horizontal property units. Development may require unification or agreement among PH co-owners.

Building Envelope

Height

ParameterValue
Max height12 m (PB + 2 PA)
PenthouseAdditional floor at 45° pitch from the main volume
ReferenceStreet level at midpoint of frontage (Art. D.178)

Occupation Factors

Factor%
FOS30%440
FOT120%1,759
FOS Verde20%293

Setbacks

DirectionDistanceNotes
Front (rambla)6 m6 m for rambla-facing frontage (Art. D.189)
Front (other streets)4 mStandard for non-rambla frontage
Laterals3 m eachBilateral
Rear3 m

Landscaping requirement: 50% of the front setback area must be landscaped.

Overhangs

1.50 m projection over front setback per Art. D.189.

Penthouse Rules

Per Art. D.167 (Galibo): The last floor (penthouse) must be set back at 45° from the setback line at the top of the floor below. This creates a mansard-type pitched volume at the top.

Development Potential

ScenarioFOT (m²)FOS (m²)HeightFloors
Residential1,75944012 mPB + 2PA + PH
Mixed (commercial PB)1,75944012 mPB + 2PA + PH

FOT of 120% = 1,759 m², achievable across 3 floors (440 m² x 3 = 1,320 m²) plus the penthouse floor adding additional area.

Key Constraints

  • PH regime — the lot is already in Propiedad Horizontal; development requires PH co-owner agreement or unification
  • FOS 30% is the binding constraint — only 440 m² of footprint on a 1,466 m² lot; the remainder must be open or landscaped
  • FOS Verde 20% — at least 293 m² must be green/landscaped areas
  • Penthouse at 45° — the top floor is pitched inward, reducing its usable area but adding a fourth level
  • Rambla frontage — 6 m setback (not 4 m), with 50% landscaping obligation
  • Curved lot boundary — the arc-shaped south edge complicates rectangular floor plate design
  • Overhangs — 1.50 m projections allowed over front setback, useful for balconies toward the rambla